05/24 - 06/24/2025
about the venue
This large-scale cellar system beneath the Buda Hills is a former limestone quarry, part of which lies beneath the aqb building.

technical parameters
- electricity: industrial power at the entrance, 3-phase, 40 A, 16 A in sockets
- 5 tunnels, each approx. 6 m wide, 3 m high, and 50 m long
- access: from the courtyard via stairs and/or a concrete ramp
- average temperature around 13 °C
- ventilation provided by fans




Events
10/26 - 10/26/2024
The Invitation
10/26 - 10/26/2024
Szabó Bea: Ereklia
05/25 - 05/25/2024
ZAJ+ za- ʐ∀ʝ z—-Z—⍺⍺⍺⍺– ⍺j +—☆☆–+— <<< zzzzz
05/24 - 05/24/2024
SPEEDRUN+++FAMILY FAST
05/17 - 12/31/2025
„don’t worry, I’m just a hop, skip, and jump away”
05/09 - 05/10/2024
Daddypower x 111rec x aqb pres. Chinabot x Marmint
09/30 - 10/01/2023
≋m≋i≋c≋r≋o≋w≋a≋v≋e≋
09/29 - 10/01/2023
Peter Teller: Microclimates
06/02 - 06/02/2022